Leeds credits and other Benefits

Many Leeds credits come standard with a pre-engineered/pre-fabricated steel building. The entire process of producing a pre-engineered steel building has been refined and developed to be as energy efficient as possible. Using recycled material, extensive design processes, regional production and shipping locations, the energy required to design, manufacture, ship and erect a pre-engineered steel building makes it one of the most efficient buildings available.

 

SALVAGE/RECYCLED MATERIALS:

(credits MR 3.1, MR3.2, MR4.1, & MR4.2)- 4 points

The raw material used to fabricate the primary structure in our steel buildings is almost all recycled steel saving on the energy intensive process of creating steel.  While keeping the costs of our buildings down, it also keeps this scrap material out of the land fill.

 

FINISHES/PAINT:

(credit EQ4.1, EQ4.2 – low-emitting materials)

Some paint finishes will conform to the requirements for these leeds points. All sealants and adhesives used on the building must conform to the leedrequirements as well; VOC (volatile organic content) must be 250grams/liter or lower.

 

COOL ROOF:

(credit SS7.2)

See the link below for more information on cool roofs and how they work.

Cool Roof Article

 

MINIMIZE REQUIRED MATERIAL:

Using extensive analysis, design, and computer modeling our pre-engineered steel buildings minimize the amount of steel required and shop time needed to fabricate the building so material isn’t wasted and the shop processes minimize their effect on our environment. This precise design process results in the lightest possible structure saving on the size and amount of concrete, of the foundations that will support the steel structure.

REUSEBLE MATERIALS:

(credit MR 1.1 and MR1.2)

In the same way we use scrap steel to fabricate our steel buildings, our buildings can be re-used, relocated, or savage for recycling. Practically 100% of our steel buildings can be re-used in one of these ways.

 

LIFE CYCLE:

With warranties of 25 years and minimal maintenance requirements, the life span of a steel building surpasses any other structural building material.

 

DAYLIGHT AND VIEWS-DAYLIGHT:

(credit IEQ8.1)

With the integration of translucent, or opaque fibre-glass light panels ot the roof and walls, our metal buildings can qualify for this leed credit which  requires 25 footcandles of natural light to 75% of the regularly occupied space.

 

ENERGY EFFICIENT:

The wall and roof assemblies in a pre-engineered steel building are versatile and can be made to meet any insulation requirements. Using thermal spacers, batt insulation, rigid insulation or sandwich panels, the thermal values of a pre-engineered steel building can far exceed new requirements set out by the building code for thermal values and green building requirements.

Metal Building Insulation
JDG CONSTRUCTION

CONTACT US


For general inquiries contact us by phone or complete the form below.
We will contact you within 2 business days.

Hours:

Mon – Fri 8am – 5pm

Phone:

Direct: 604-986-4494
Toll Free:1-800-986-4494
Fax: 604-986-4490

Address:

1070 14th Street West
North Vancouver
B.C. Canada V7P 3P3

Address:

Find us on Google Maps

Send us a message







    Click Send Now and wait for Success Message